Skip to content

Cycle Log icon

Cycle Log

Your rides. Your device.
Home screen with weekly, monthly, yearly, and all-time stats Ride dashboard during a ride with live speed, distance, elapsed time, heading, altitude, and grade Map page during a ride, with the route so far drawn on the map and live speed, distance, elapsed time, and average speed below Ride history grouped by month with per-cycle filter chips Ride detail for a Central Park loop with the route map, active and total time, distance, average and max speed, and elevation gain My Cycles screen listing cycles with lifetime distance totals

Features

Private by design

Everything stays on your device — no account, no ads, no tracking. Read the privacy policy.

GPS ride recording

Real-time speed, distance, elevation, and gradient as you ride.

Records with the screen off

Lock your phone or drop it in a bag — the ride keeps recording until you stop it.

Choose your map

Ride on CyclOSM, OpenStreetMap, OpenTopoMap, or satellite imagery, with a dark map for night rides. Four more layers unlock with your own free Thunderforest or Stadia key.

Barometer altitude

Uses your device's pressure sensor when available, calibrated against terrain elevation data, for more accurate elevation.

Pause & resume

Stop the clock mid-ride without ending your session — or let auto-pause handle it when you stop and start moving.

Multiple cycles

Track stats separately for each cycle you own.

Per-cycle log

Keep a dated history of notes and events for every cycle.

Strava integration

Upload rides directly to Strava or export them as GPX.

GPX & FIT import & export

Share rides with any compatible app — Cycle Log's own GPX files round-trip losslessly, and FIT files from Garmin or Wahoo import and export too, even in bulk from a zip.

Customizable dashboard

Choose the metrics on every ride page — speed, grade, odometer, calories, battery, and more.

Ride history & stats

Filter and sort every ride, and see weekly, monthly, yearly, and all-time totals per cycle.

Emergency check-in

Text a saved contact a pre-filled check-in with a map link to where you are, right from the ride screen.

Imperial & metric

Switch units at any time in Settings.

Local backup & restore

Save a copy of your whole database and restore it anytime.

Download

Available on Android — get it on Google Play. Want new features early? Join the open testing program to get test builds before they reach everyone.

Cycle Log is free and ad-free — if it's useful to you, you can buy me a coffee.